SB 320: Power duration requirements in emergency contingency plans adopted by end stage renal disease facilities
90th Regular Session (2027). Status: Filed. Latest official action Nov 10, 2026: Filed.
Plain-language summary
The proposed Texas legislation would require end stage renal disease facilities to adopt emergency contingency plans with specific power duration requirements. Each facility would need to have an on-site emergency generator with a type 2 essential electrical distribution system, installed and maintained according to National Fire Protection Association standards, and kept at least 10 feet from the electrical transformer. The facility would also need to maintain either an on-site fuel source with sufficient capacity to power the generator for at least 72 hours or an on-site battery-powered generator with sufficient electrical capacity to power the facility for at least 72 hours. Additionally, the facility would need to maintain a sufficient quantity of potable water on-site to operate the water treatment system for at least 24 hours and have a water valve connection for outside vendors to provide potable water. Each facility would need to modify its emergency contingency plan by December 1, 2027, to comply with the new requirements. The legislation would take effect on September 1, 2027.
Automated summary — check the official text.
Action history
- Filed
- Received by the Secretary of the Senate
People & topics
- Authors
- Miles
- Official subjects
- Disaster Preparedness & Relief · Health Care Providers · Health--Other Diseases & Medical Conditions · Utilities--Electric